(2006). Mathematical Modelling Study to Support Updating/Upgrading the Feasibility Study of Dhaka Integrated Flood Control Embankment cum Eastern Bypass Road Multipurpose Project: Final Report (Final report ed.). Halcrow Bangladesh Limited.
Cita Chicago (17th ed.)Mathematical Modelling Study to Support Updating/Upgrading the Feasibility Study of Dhaka Integrated Flood Control Embankment Cum Eastern Bypass Road Multipurpose Project: Final Report. Final report ed. Dhaka: Halcrow Bangladesh Limited, 2006.
Cita MLA (9th ed.)Mathematical Modelling Study to Support Updating/Upgrading the Feasibility Study of Dhaka Integrated Flood Control Embankment Cum Eastern Bypass Road Multipurpose Project: Final Report. Final report ed. Halcrow Bangladesh Limited, 2006.