Dhaka Integrated Flood Protection : Final Report /

I tiakina i:
Ngā taipitopito rārangi puna kōrero
Hōputu: Pukapuka
I whakaputaina: Dhaka: Flood Plan Coordination Organization C1991.
Putanga:Final report ed.
Rangatū:FAP-8B
Ngā marau:
Ngā Tūtohu: Tāpirihia he Tūtohu
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!

MARC

LEADER 00000nam a2200000 i 4500
001 144996
005 20261026014945.0
040 |a BD-SaJUCL  |b eng  |e rda  |c BD-SaJUCL 
245 0 0 |a Dhaka Integrated Flood Protection :  |b Final Report /  |c Louis Berger International, Inc. 
250 |a Final report ed. 
264 1 |a Dhaka:  |b Flood Plan Coordination Organization  |c C1991. 
300 |a 16p. 
490 1 |a FAP-8B 
082 0 4 |a 627.40954922  |b L889d  |2 23 
650 0 |a Flood control -- Bangladesh -- Dhaka 
650 0 |a Flood damage prevention -- Bangladesh -- Dhaka 
650 0 |a Drainage -- Bangladesh -- Dhaka 
942 |c BK  |n 0 
999 |c 144996  |d 144996