(2018). The Preparatory Study on The Dhaka Mass Rapid Transit Development Project (Line 5) In Bangladesh: Final Report (Final report.). Japan International Cooperation Agency.
Cita Chicago (17th ed.)The Preparatory Study on The Dhaka Mass Rapid Transit Development Project (Line 5) In Bangladesh: Final Report. Final report. Dhaka: Japan International Cooperation Agency, 2018.
Cita MLA (9th ed.)The Preparatory Study on The Dhaka Mass Rapid Transit Development Project (Line 5) In Bangladesh: Final Report. Final report. Japan International Cooperation Agency, 2018.
Atenció: Aquestes cites poden no estar 100% correctes.