APA citiranje

(2018). The Preparatory Study on The Dhaka Mass Rapid Transit Development Project (Line 5) In Bangladesh: Final Report (Final report.). Japan International Cooperation Agency.

Chicago Style (17th ed.) Citation

The Preparatory Study on The Dhaka Mass Rapid Transit Development Project (Line 5) In Bangladesh: Final Report. Final report. Dhaka: Japan International Cooperation Agency, 2018.

MLA citiranje

The Preparatory Study on The Dhaka Mass Rapid Transit Development Project (Line 5) In Bangladesh: Final Report. Final report. Japan International Cooperation Agency, 2018.

Opozorilo: Ti citati niso vedno 100% točni.