Force Majeure in the Hydropower Industry Concepts and Case Studies /

This book aims to highlight the particular situation faced by certain hydropower companies by the fact that they cannot fulfil their contracts due to force majeure. The first part of this book will be an analysis of how water is used in electricity production. It is important to point out that all t...

Volledige beschrijving

Bewaard in:
Bibliografische gegevens
Hoofdauteur: Diaconu, Daniel Constantin (Auteur)
Coauteur: SpringerLink (Online service)
Formaat: Elektronisch E-boek
Taal:Engels
Gepubliceerd in: Cham : Springer International Publishing : Imprint: Springer, 2023.
Editie:1st ed. 2023.
Onderwerpen:
Online toegang:https://doi.org/10.1007/978-3-031-27402-2
Tags: Voeg label toe
Geen labels, Wees de eerste die dit record labelt!

MARC

LEADER 00000nam a22000005i 4500
001 978-3-031-27402-2
003 DE-He213
005 20260810170012.0
007 cr nn 008mamaa
008 230322s2023 sz | o |||| 0|eng d
020 |a 9783031274022  |9 978-3-031-27402-2 
024 7 |a 10.1007/978-3-031-27402-2  |2 doi 
050 4 |a GB651-2998 
072 7 |a RBK  |2 bicssc 
072 7 |a SCI081000  |2 bisacsh 
072 7 |a RBK  |2 thema 
082 0 4 |a 551.48  |2 23 
100 1 |a Diaconu, Daniel Constantin.  |e author.  |0 (orcid)0000-0002-0468-6703  |1 https://orcid.org/0000-0002-0468-6703  |4 aut  |4 http://id.loc.gov/vocabulary/relators/aut 
245 1 0 |a Force Majeure in the Hydropower Industry  |h [electronic resource] :  |b Concepts and Case Studies /  |c by Daniel Constantin Diaconu. 
250 |a 1st ed. 2023. 
264 1 |a Cham :  |b Springer International Publishing :  |b Imprint: Springer,  |c 2023. 
300 |a 1 online resource (XI, 156 p. 35 illus.).  |b 32 illus. in color. 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
341 0 |b Table of contents navigation  |2 onix 
341 0 |b Single logical reading order  |2 onix 
341 0 |b Short alternative textual descriptions  |2 onix 
341 0 |b Use of color is not sole means of conveying information  |2 onix 
341 0 |b Use of high contrast between text and background color  |2 onix 
341 0 |b Next / Previous structural navigation  |2 onix 
341 0 |b All non-decorative content supports reading without sight  |2 onix 
347 |a text file  |b PDF  |2 rda 
505 0 |a Chapter 1 Introduction -- Chapter 2 Water for energy versus energy for water -- Chapter 3. Energy sectors that use water -- Chapter 4. The context of the development of the World hydropower sector -- Chapter 5. The impact of drought on the hydropower domain -- Chapter 6. Force majeure -- Chapter 7. Sample contractual provisions, which must be contained in a force majeure contract -- Chapter 8. Concrete cases of invocation of force majeure -- Chapter 9. Romania, in a European energy context -- Chapter 10. Settlement of the dispute, in case the force majeure clause is invoked by Hidroelectrica SA -- Chapter 11. Electricity, systemic crises and environmental policies. 
520 |a This book aims to highlight the particular situation faced by certain hydropower companies by the fact that they cannot fulfil their contracts due to force majeure. The first part of this book will be an analysis of how water is used in electricity production. It is important to point out that all types of energy sources use water, to a different extent, of course, and that its spatial and temporal availability is very important. The focus will be on hydropower, presenting the current situation at the global level, and the effect of reducing the amounts of water in the river system. The second part is based on the presentation of the concept of force majeure and the ways of presenting and drafting it in a contract. Many disputes or the success of a contract depended heavily on the provisions of this article of the contract. Obviously, there are also situations in which the signatory parties abuse or are not protected by these provisions of force majeure. Starting from a few brief examples from the international level, we reach a wide discussion of the situation created in Romania, when the largest supplier of electricity produced on the basis of water terminates several contracts invoking force majeure. The manner in which the opinion of the parties involved is presented to the court is analyzed and presented in detail. 
532 8 |a Accessibility summary: This PDF does not fully comply with PDF/UA standards, but does feature limited screen reader support, described non-text content (images, graphs), bookmarks for easy navigation and searchable, selectable text. Users of assistive technologies may experience difficulty navigating or interpreting content in this document. We recognize the importance of accessibility, and we welcome queries about accessibility for any of our products. If you have a question or an access need, please get in touch with us at accessibilitysupport@springernature.com. 
532 8 |a No reading system accessibility options actively disabled 
532 8 |a Publisher contact for further accessibility information: accessibilitysupport@springernature.com 
588 |a Print version record. 
650 0 |a Water. 
650 0 |a Hydrology. 
650 0 |a Water-power. 
650 0 |a Environmental Law. 
650 0 |a Environment. 
650 0 |a Earth sciences. 
650 1 4 |a Water. 
650 2 4 |a Hydroenergy. 
650 2 4 |a Environmental Law. 
650 2 4 |a Environmental Sciences. 
650 2 4 |a Earth Sciences. 
710 2 |a SpringerLink (Online service) 
773 0 |t Springer Nature eBook 
776 0 8 |i Printed edition:  |z 9783031274015 
776 0 8 |i Printed edition:  |z 9783031274039 
856 4 0 |u https://doi.org/10.1007/978-3-031-27402-2 
912 |a ZDB-2-EES 
912 |a ZDB-2-SXEE 
950 |a Earth and Environmental Science (SpringerNature-11646) 
950 |a Earth and Environmental Science (R0) (SpringerNature-43711)